You don't have javascript enabled. Good luck with that.
Pencarian
 MRT Fase 2 akan Terintegrasi dengan Stasiun Kota

MRT Phase 2 will Be Integrated with Kota Station

PT MRT Jakarta stated that the MRT phase 2 with route HI Roundabout (HI)-Kota will be integrated with Kota Station.

It will also be integrated with Kota Tua

"It will also be integrated with Kota Tua," expressed PT MRT Jakarta President Director, William Sabandar, Thursday (6/20).

MRT Phase 2 and Phase 1 Construction are Simultaneously

Even, there will be several stations that are historical and monumental in the Monas, Harmoni and Kota Tua areas.

"This phase 2 has 8.3 kilometers length with a distance of about 20 minutes from the HI Roundabout to Kota Tua," he told.

The next phase is planned to be made across the underground. Its depth is also made deeper than phase 1.

"Phase 2 is totally developed underground," he stated.

Linked News
Popular News indeks
  1. MRT Jakarta Integrates Ticket Payments with JakLingko from October 12

    access_time10-10-2026 remove_red_eye537 personAldi Geri Lumban Tobing
  2. Jakarta Administration Steps Up Proactive Fire Prevention Efforts

    access_time09-10-2026 remove_red_eye536 personDessy Suciati
  3. New Kelapa Gading-Pulogadung Road to Ease Traffic and Improve Access

    access_time10-10-2026 remove_red_eye529 personAldi Geri Lumban Tobing
  4. Kramat Pulo Fire Survivors Get Help Replacing School Documents

    access_time09-10-2026 remove_red_eye516 personFolmer
  5. Basic Supplies Distributed to Pinang Ranti Fire Survivors

    access_time09-10-2026 remove_red_eye506 personNurito